Category: Method Statements

Reinforced concrete formwork

Steel Reinforcement and Formwork

 safetyadmin  0 Comments on Steel Reinforcement and Formwork

Fixing Reinforcement  ( A 6 page method statement is available HERE) Engineers will set out the main outline of the…

Brick and Blockwork Pack

 safetyadmin  0 Comments on Brick and Blockwork Pack

In general brick and blockwork method statements and risk assessments will contain the following information:- All drawings will be studied…

House builders safety docs

Small Building Works Safety Documents

 safetyadmin  0 Comments on Small Building Works Safety Documents

When undertaking  small building works such as a new house or larger extension Method statements and Risk Assessments are essential….

residential demolition

Method Statement for Demolition

 safetyadmin  0 Comments on Method Statement for Demolition

When the demolition of a small scale building or residential property is required then a method statement should be written….

Basic Method Statement Kerbs and Gully Construction

 safetyadmin  0 Comments on Basic Method Statement Kerbs and Gully Construction

Check that the issued construction drawing is the latest revision. Kerbs 1.    Engineer to set out Kerb lines, gully and…

Method Statement for Construction of Manhole Chambers

 safetyadmin  0 Comments on Method Statement for Construction of Manhole Chambers

Method Statement for the Construction of Manhole Chambers This example is for the construction of basic manhole chambers with concrete…

New Road Construction Safety

 safetyadmin  0 Comments on New Road Construction Safety

New road construction has risks and therefore the various phases of the work do require method statements and risk assessments….

method statement template

Method Statement Template

 safetyadmin  0 Comments on Method Statement Template

Method Statement Template Method statements are written to provide a “safe system of work” the information they contain is compiled…

Method statement example:- Access Road and Protection Slabs

 safetyadmin  0 Comments on Method statement example:- Access Road and Protection Slabs

This is an example detailed method statement for the site setup and carrying out of a new access road and…

PAT Testing Method Statement

 safetyadmin  0 Comments on PAT Testing Method Statement

When Carrying out Portable Appliance testing (PAT) an example method statement is as follows:- Arrive at client premises, identify PAT…

The Site Engineer’s Roles and Responsibilities

 safetyadmin  0 Comments on The Site Engineer’s Roles and Responsibilities

  Quality Control – The Site Engineers Role and Responsibilities Accurate extraction of pertinent setting out information from issued drawings…

Health & Safety for Small Builders

 safetyadmin  1 Comment on Health & Safety for Small Builders

Small Builders are those who carry out domestic projects for private home owners or those that carry out small business…