Category: Method Statements

Builders Safety Document Pack

 safetyadmin  0 Comments on Builders Safety Document Pack

Our popular Builders Pack of method statements, risk assessments, coshh assessments and more has been updated with more documents, there…

Excavator loading a crusher

Method Statement for the control of Dust on Construction Sites

 safetyadmin  0 Comments on Method Statement for the control of Dust on Construction Sites

Dust generated on construction sites is not only a nuisance to nearby properties, but could be hazardous if generated and…

House builders safety docs

Small Builders Health and Safety

 safetyadmin  0 Comments on Small Builders Health and Safety

Small Builders Health and Safety Small builders typically working on domestic work such as repairs and extensions, loft conversions in…

copyright dreamstime

Method Statement for a Bathroom refit

 safetyadmin  0 Comments on Method Statement for a Bathroom refit

This is a very basic example Method Statement for a Bathroom refit. Main Risk Areas:- Manual Handling Slips Trips and…

site rules for safety

Method Statement for the demolition of existing internal masonry walls

 safetyadmin  0 Comments on Method Statement for the demolition of existing internal masonry walls

Example Method Statement for the demolition of existing internal masonry walls Work to be done:- Demolish existing internal walls in…

Method Statement for Concrete Blinding and Steel Fixing

 safetyadmin  0 Comments on Method Statement for Concrete Blinding and Steel Fixing

The initial tasks required when carrying out reinforced concrete works will normally consist of excavations, then blinding (creating a strong…

Power Tools

Method Statement for Kitchen Installation

 safetyadmin  0 Comments on Method Statement for Kitchen Installation

Planned Works: To install a new kitchen comprising of new units and appliances. Location of Work Area: Number 1 Any…

demolition ppe

Method Statement for Stonework

 safetyadmin  0 Comments on Method Statement for Stonework

Scope of Works  This example method statement covers the works involved in Block laying and Stonework facing to a steel…

Reinforced concrete formwork

Method Statement for Reinforced Concrete

 safetyadmin  0 Comments on Method Statement for Reinforced Concrete

Erecting Formwork The formwork will be a proprietary panel type system. Wall panels will be faced to produce a fair…

man tiling a wall

Wall and Floor Tiling Method Statement

 safetyadmin  0 Comments on Wall and Floor Tiling Method Statement

Description of Works: (Main objective) To prepare surfaces and lay wall and floor tiles to contract requirements   Associated Health,…

Excavator loading a crusher

Method Statement for Material Crushing

 safetyadmin  0 Comments on Method Statement for Material Crushing

Method Statement for Crushing Rock or Demolition Material   Scope of Works.  Method Statement for the crushing of rock and…

Method Statements for Construction

 safetyadmin  0 Comments on Method Statements for Construction

Method statements are used on practically all building and construction projects, In the UK and Ireland and many other countries…