Recent Comments
- Daryl on Falls from Height
- Paschal o Grady on Evaluation of Method Statements
- method statement for bricklaying | Builders Safety on Brick & Block Laying Safety Document Pack
- safetyadmin on Safe Setting out of Pipelines and Manholes
- Rick Davis on Safe Setting out of Pipelines and Manholes
-
Recent Posts
Categories
Meta
Recent Comments
- Daryl on Falls from Height
- Paschal o Grady on Evaluation of Method Statements
- method statement for bricklaying | Builders Safety on Brick & Block Laying Safety Document Pack
- safetyadmin on Safe Setting out of Pipelines and Manholes
- Rick Davis on Safe Setting out of Pipelines and Manholes
-
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
Method Statement For Bricklaying
In Health and Safety | By safetyadmin | On September 21 2021 09:17 AM | Comments Off on Method Statement For Bricklaying
What should be included in a Method Statement for Bricklaying?
The Task:
To Complete Bricklaying work to the required line, level and elevations as per Architect & Design Drawings.
Welfare and First Aid facilities such as:-
(Main Contractor site cabins with WC and washing ...
Brick and Blockwork Pack
In Health and Safety | By safetyadmin | On July 17 2018 09:11 AM | Comments Off on Brick and Blockwork Pack
In general brick and blockwork method statements and risk assessments will contain the following information:-
All drawings will be studied and understood before works commence. (test walls if required for architects approval)
Lines and levels to be set out by ...
Evaluation of Method Statements
Evaluation of Method Statements:-
When you (as a main contractor or client) receive method statements you should evaluate them to ensure the contractor has complied with the contract requirements for method statements.
The content should include:
Task/process and area of specialisation.
Sequence of work ...
Wall and Floor Tiling Method Statement
In Method Statements | By safetyadmin | On January 13 2014 09:42 AM | Comments Off on Wall and Floor Tiling Method Statement
Description of Works:
(Main objective)
To prepare surfaces and lay wall and floor tiles to contract requirements
Associated Health, Safety and Environmental Assessments:-
(Risk Assessments, COSHH Assessments etc.)
Manual Handling
Product Safety Data Sheets
COSHH Assessments Where required
Steps that can be taken to reduce risks:-
Use of Mechanical ...
Brick & Block Laying Safety Document Pack
In COSHH | By safetyadmin | On July 10 2013 07:41 AM | Comments Off on Brick & Block Laying Safety Document Pack
To assist Brick and Block laying companies and individuals we have put together a professional set of Health & Safety Method Statements, Risk Assessments and COSHH Assessments, these are perfect for any sized company and are suitable for use in ...
Method Statement for Bricklaying
In Method Statements | By safetyadmin | On February 6 2013 11:37 AM | Comments Off on Method Statement for Bricklaying
This is an example of a Method Statement for bricklaying.
METHOD STATEMENT
Project Name: Project Number:
Work Activity: Brick laying Work Location:
Date: Reference Number:
Prepared by: Approved by:
Objective:
To Complete Bricklaying work to the required line, level and elevations as per Architect & Design Drawings.
Location:
Timescale:
Welfare ...