Recent Comments
- Daryl on Falls from Height
- Paschal o Grady on Evaluation of Method Statements
- method statement for bricklaying | Builders Safety on Brick & Block Laying Safety Document Pack
- safetyadmin on Safe Setting out of Pipelines and Manholes
- Rick Davis on Safe Setting out of Pipelines and Manholes
-
Recent Posts
Categories
Meta
Recent Comments
- Daryl on Falls from Height
- Paschal o Grady on Evaluation of Method Statements
- method statement for bricklaying | Builders Safety on Brick & Block Laying Safety Document Pack
- safetyadmin on Safe Setting out of Pipelines and Manholes
- Rick Davis on Safe Setting out of Pipelines and Manholes
-
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
Drainage Method Statement
In Health and Safety | By safetyadmin | On December 3 2021 10:36 AM | Comments Off on Drainage Method Statement
This example Method statement shows the basic requirements for a method statement for installing drainage:-
Objective:
Installation, and connection of new drainage pipes to existing surface and foul manholes.
Location:
A site somewhere.
Timescale:
(Add Programmed start and end for this phase of works)
Welfare and First ...
Risk Assessment For Excavations
In Health and Safety | By safetyadmin | On July 28 2013 02:35 PM | Comments Off on Risk Assessment For Excavations
Working with excavators and excavations is a medium to high risk activity.
Areas that should be addressed and all information obtained should be used to during the planning and preparation for excavation work.
Ground conditions ( Have the conditions been checked, is the ...
Visiting Contractors Safety
In Health and Safety | By safetyadmin | On July 14 2013 09:12 AM | Comments Off on Visiting Contractors Safety
Visiting Contractors
Companies shall induct all contractors in the following relevant safety and communication issues in the workplace:
Introduction to the organisational structure of the company.
Introduction to any occupational health and safety personnel working for the company.
Presentation, explanation and discussion of the ...
Method Statement for Installing Underground Tanks
In Method Statements | By safetyadmin | On June 27 2013 08:04 AM | Comments Off on Method Statement for Installing Underground Tanks
This example method statement is for the installation of sewerage package plant tanks, however its adaptable for the installation of any pre-cast or manufactured underground tanks.
Location: Add
Timescale: Add
Welfare and First Aid:
Facilities available on some sites, First Aid and hand wash ...
Safe Setting out of Pipelines and Manholes
Safe Setting out of Pipelines and Manholes.
Accurate extraction of pertinent setting out information from issued drawings
Coordinates, Levels, Built in Items, References to Standard details checked. Notes on the drawings have been read and understood.
Preparation for setting out
Ensuring ...
Method Statement for Drainage Work
In Method Statements | By safetyadmin | On March 17 2013 01:52 PM | Comments Off on Method Statement for Drainage Work
This example Method statement shows the basic requirements for a method statement for installing drainage.
Objective:
Installation, and connection of new 100mm drainage pipes to existing surface and foul manholes
Location:
A site somewhere.
Timescale:
(Add Programmed start and end for this phase of works)
Welfare and ...