Categories
- COSHH (7)
- Health and Safety (76)
- Method Statements (70)
- Personal Protective Equipment (1)
- Risk Assessments (56)
-
Pages
-
Archives
- June 2020 (1)
- January 2020 (1)
- November 2019 (1)
- August 2019 (1)
- April 2019 (1)
- March 2019 (1)
- February 2019 (1)
- January 2019 (4)
- September 2018 (1)
- July 2018 (2)
- April 2018 (1)
- December 2016 (1)
-
Blogroll
-
Meta
Demolition Hazards
In Health and Safety | By safetyadmin | On January 6 2020 10:06 AM | Comments Off on Demolition Hazards
Hazards
PLAN ahead to get the job done safely
Proper planning is essential to ensure a demolition operation is conducted with no accidents or injuries. This includes, but is not limited to:
An engineering survey completed by a competent person before any ...
Demolition of Internal Load Bearing Walls
In Method Statements | By safetyadmin | On August 16 2019 02:58 PM | Comments Off on Demolition of Internal Load Bearing Walls
Basic Safe Work Method:- For Demolition of Internal Load Bearing Walls
Ensure that all services to the area have been isolated by trained and certified persons.
Access to the work area is to be restricted to demolition workers only, public to be ...
House Builders Safety Document Pack
In COSHH | By safetyadmin | On February 6 2019 03:55 PM | Comments Off on House Builders Safety Document Pack
We have completed a new House builders safety document pack that contains Method Statements, Risk Assessments and COSHH, These cover all aspects of house building from site establishment to plastering and decorating. The current 30 document pack contains the following ...
Demolition Risks
In Health and Safety | By safetyadmin | On January 23 2019 11:32 AM | Comments Off on Demolition Risks
The UK Health & Safety Executive states that any demolition or structural alterations and removals must be carefully planned and carried out in a manner that prevents danger.
All persons involved from design to workers must be competent and aware of ...
Construction Method Statements & Risk Assessm...
In Method Statements | By safetyadmin | On January 18 2019 11:02 AM | Comments Off on Construction Method Statements & Risk Assessments Pack
Our popular Builders Mega Pack has been reduced in price, we offer over 50 documents for just £149.99 £59.99
These are written by a Chartered and registered Building Engineer with over 30 years site experience including site and project management and ...
Steel Reinforcement and Formwork
In Health and Safety | By safetyadmin | On September 4 2018 07:58 AM | Comments Off on Steel Reinforcement and Formwork
Fixing Reinforcement ( A 6 page method statement is available HERE)
Engineers will set out the main outline of the structure and all internal walls using Hilti nails hammered into the blinding concrete. Datum’s will be given for fixing wall reinforcement ...
Brick and Blockwork Pack
In Health and Safety | By safetyadmin | On July 17 2018 09:11 AM | Comments Off on Brick and Blockwork Pack
In general brick and blockwork method statements and risk assessments will contain the following information:-
All drawings will be studied and understood before works commence. (test walls if required for architects approval)
Lines and levels to be set out by ...
Small Building Works Safety Documents
In Health and Safety | By safetyadmin | On July 16 2018 08:16 AM | Comments Off on Small Building Works Safety Documents
When undertaking small building works such as a new house or larger extension Method statements and Risk Assessments are essential.
These Method statements would normally cover :-
Concrete Foundations
Block and Beam Flooring
Brick and Blockwork
Drainage
Plastering
Painting and Decorating
The Risk areas and assessments should generally ...
Method Statement for Demolition
In Method Statements | By safetyadmin | On April 27 2018 09:30 AM | Comments Off on Method Statement for Demolition
When the demolition of a small scale building or residential property is required then a method statement should be written.
The generic safe work steps of this example method statement are common but the safe work method must be written with ...
Basic Method Statement Kerbs and Gully Constructio...
In Method Statements | By safetyadmin | On August 4 2016 07:59 AM | Comments Off on Basic Method Statement Kerbs and Gully Construction
Check that the issued construction drawing is the latest revision.
Kerbs
1. Engineer to set out Kerb lines, gully and manhole positions.
2. Kerb pans to be set up and concreted in accordance with the design spec.
3. String lines to be tied to ...
Method Statement for Construction of Manhole Chamb...
In Method Statements | By safetyadmin | On April 5 2016 09:07 AM | Comments Off on Method Statement for Construction of Manhole Chambers
Method Statement for the Construction of Manhole Chambers
This example is for the construction of basic manhole chambers with concrete surrounds.
The Engineer to set out the manhole position and carry out a CAT scan of area and dig trial holes in ...
New Road Construction Safety
In Method Statements | By safetyadmin | On December 23 2015 10:21 AM | Comments Off on New Road Construction Safety
New road construction has risks and therefore the various phases of the work do require method statements and risk assessments.
The basic phase for new road construction are:-
Setting out of the new road
Dimensional control, traversing and checking supplied control stations and ...