Risk Control
Risk Control
Your company shall control all risks to whatever extent is practically possible, once they have been identified. The sequence of implementing controls is as follows:-
Eliminating the hazard.
Substituting the hazard.
Modifying the process.
Isolating the hazard.
Implementing engineering controls.
Using a combination of controls.
Using ...