Month: March 2013

Construction Site Waste Management

 safetyadmin  0 Comments on Construction Site Waste Management

 Waste Management Construction sites can generate vast amounts of waste, this can be in the form of packaging, timber, material…

residential demolition

Risk Assessment for Demolition

 safetyadmin

This example Risk Assessment is for a small scale demolition project. The initial Risk Score prior to adding steps to…

Procedures for Site Inductions

 safetyadmin

Induction of new employees on a building site is vital for the health and safety of the site, the “old…

Safe work Related Signage

Safe Work Method Statement for Site Establishment

 safetyadmin

When establishing a new building Site there are risks that need to be reduced as part of the setting up…

Excavating to lay drainage pipe

Method Statement for Drainage Work

 safetyadmin

This example Method statement shows the basic requirements for a method statement for installing drainage. Objective: Installation, and connection of…

Concrete block and beam floors

Method Statement for Block and Beam Flooring

 safetyadmin

This example method statement for block and beam flooring contains  basic risk reduction and safe work method steps:- Reducing Risk:-…

Cement Mixer

Risk Assessment for Using A Cement Mixer

 safetyadmin

One of the most common jobs on any building site is mixing cement in a cement mixer, this task is…

Excavator at work

Construction Plant and Equipment Safety Checklist

 safetyadmin

Plant and Equipment (PUWER) Provision and use of Work Equipment Regulations 1998 (UK) Company’s should be committed to providing a…

Sewer access

Risk Assessment for Confined Spaces

 safetyadmin

A Confined Space is any space where due to being enclosed there are specified risks, these can be Manholes, Pipelines,…